Boiler Troubleshooting

Vessel: MV ProteXXXX st GXXXXX
Location: At Port Of Trincomalee
 

Complete Automation troubleshooting
The Boiler was completely out of order, burner was out and disassembled, complete wiring was removed and not proper, The request from ship owner to put the boiler in to operation.

Team Boarded the vessel and initial checks been carried out. Burner Parts found and all the removed parts inspected closely by the CIAP expertise. Complete rotary cup burner assembled with proper clearance and burner housing, diffuser plates, air duct properly cleaned, Boiler furnace and tube stack close inspection carried out and hydraulic pressure test carried out prior starting the boiler.

CIAP Electrical and automation engineers put complete wiring, termination back to normal and took bit longer time to test all the safety loops which were disconnected or by-passed.

Once all in good order Rotary cup burner tried out to check the assembly. Soon after the confirmation of mechanical part automation system powered up and trouble shooting carried out on firing sequence.

Boiler water level controller, Boiler pressure controller and modulation controller re-programmed and components calibrated.
Boiler operation completely put it in to Fully automatic operation and same offered to ship staff after successful trials.
Thank you, owners and agents for trusting us and happy we serve our best to our clients.

#ciap #ciappvtltd #ciapmarine #lankamarine #srilankamarine #electrical #automation #ElectricalTroubleshooting #automationtroubleshooting #repair #rectification #shiprepair #ETA #vessel #boiler #boilerservice #boilerautomation #Burner #boilerburner #Boilermakers #maintenance #shipmaintenance #shipservices #breakdown #MarineRepairs #shipbrokers #workshop #shiprepairworkshop #marineworkshop #serveswithprofessionalism

We are one click away from you. Contact us for Ship repairs, Operations, ship management, supplies or for agencies.

+94719 645 645 (HOT LINE) or mail us ciapinfo@ciap.ltd

www.ciap.ltd