Bulk Carrier Boiler troubleshooting (Milestone)

Vessel: MV VishXX Vixx
 
System: Boiler System
 
Location: Ship Yard
 

Perfect short term excellent troubleshooting by CIAP professionals. A quick response was done by CIAP, following the short notice by the yard to troubleshoot firing issue on bulk carrier boiler which was not starting in auto mode, modulation not happening and air-fuel ratios were not proper hence black smoke while they firing in emergency mode.

CIAP Engineers committed with their maximum effort attended the work and rectified Automatic firing issue after heavy troubleshooting following modulating issue. Rectified issues of Low Low water level controller, Modulation, Air Servo and Oil servo well. All adjusted and fired the boiler as witnessed by Ships engineers. Complete Firing sequence was brought in to proper order. Needed Adjustment was done including the final tuning. The same was handed over to Ship Engineers after 18 hours of heavy troubleshooting.

This was a positive initiative and successful completion of the given work. Thumbs Up Team CIAP.