Pre Docking repairs BY CIAP (Milestone)

Vessel: MV MSC Mxxxsa X
 
Location: Port Of Colombo
 

High-quality professional work by Team CIAP.

The ship was carried to Port of Colombo and the Main engine was having heavy LO contamination on the system oil. The job was offered to CIAP by another party and successfully completed the following tasks and overhauls.

After the repairs and maintenance, they are heading to their docking period. They significantly reduce the Dock period since we carried out some of the main work as afloat repairs.

Main engine All cylinder head overhaul (7 units)

Main engine exhaust valve overhaul (7 units)

Main engine fuel pump overhaul (7 units)

Fuel Oil roller guide Overhaul (7 units)

Exhaust roller guide overhaul. (7 Units)

Complete boiler automation and troubleshooting,

Leaky Boiler tubes welding and blanking

Both LT cooler Cleaning

Three alternators are taken out and complete chemical washing was carried out

All overhauling’s done by professional engineers and technicians as per the makers instruction. Sea trials are done and all were found in order Job successfully completed with thin the time frame they offered without any delays.

Well-done team CIAP and Thumbs Up.